July 2012 (part 2)
Tuesday 10th
South end/main road...
North end
Last of the causeway and ramp
Bridge from beach level
New roadway
North end beach work
Wed 11th Jul
'Bollard' positioned.
Fri 13th Jul
South end, west side excavation...
New roadway - shuttering on piles
South end
Mon 16th Jul
South end - footpath work
South end, west side...
South end, west side - building new drain sump
Drain pipes, main road, west side.
West wall of new roadway
Tue 17th Jul
Main deck underside
North end, shuttering
Main road - drain sump. (NB: bollard on the left will reappear later.)
South end - traffic island rebuild, around power junction box.
Thu 19th Jul
East side footpath with power and telecomm access hatches. (Note drain-pipe at end of kerb drains.)
Bridge kerbing, west side...
North end - new concrete base for east wall
Masons working on new east wall.
New roadway - infilling by North Sluice...
South end, west side - drain sump. NB: wall behind has grown since previous sump pic!
Main road
Previous page
Foot of July 2012 (part 2)
Next page